Congress Seeks Review of Keystone Pipeline in Wake of Spill

BISMARCK, N.D. (AP) — Top U.S. House Democrats have called... Read More

Saipem Wins $100 Million Equatorial Guinea Pipeline Contract

CAPE TOWN (Reuters) — Italy’s Saipem has been awarded a ... Read More

Moda Midstream to Expand Loading Center, Evaluate New Pipeline

(Reuters) — U.S. oil export terminal operator Moda Midstre... Read More

Iran Building Oil Pipeline to Terminal Outside Gulf

Iran is building a $1.8 billion oil pipeline to its port of ... Read More

Columbia Gas Names New President

 Columbia Gas of Kentucky named Kimra H. Cole as its presid... Read More

Welding Superintendent Named Man of the Year

Michels Welding Superintendent Charles “Buddy” Kervin wa... Read More

API Names Next CEO

The American Petroleum Institute (API) has elected Mike Som... Read More

PLCA Names Shuler President of Associate Members

The Pipe Line Contractors Association (PLCA) has named Jared... Read More

National Grid Lifts NY Service Moratorium

(PLN) – National Grid has reached an agreement with the st... Read More

Pioneer Natural CEO Calls Out Permian Basin Gas Flaring

HOUSTON (Reuters) – The chief executive of Pioneer Natural... Read More

Columbia Gas Names New President

 Columbia Gas of Kentucky named Kimra H. Cole as its presid... Read More

Storm Disrupts US Energy Operations from Pipelines to Terminals

HOUSTON (Reuters) – Energy infrastructure on the U.S.... Read More

Planned Projects

Owner: Buckeye Partners LP

Project: South Texas Gateway Pipeline

Type: Project includes the construction of a 24-inch distribution system named Buckeye Texas Market Center; the addition of a fifth deep-water dock at the BTP facilities, capable of high-rate loading Suezmax-sized vessels, which would complement existing export and import capabilities; the expansion of the storage capabilities at BTP’s Corpus Christi facilities; and the construction of a long-haul pipeline

Location: Wink and Midland, TX – Corpus Christi, TX

Start: 2019

Comments: Project is currently undergoing an open season and, when complete, will have a total capacity of up to 400 Mbpd with multiple segregations

New Projects

Owner: Enterprise Products Partners LP

Contractor(s): Primoris/Holloman Corp./Pumpco

Project: Midland-to-Sealy Pipeline

Type: Project includes the construction of 24-inch pipeline

Miles: 416

Location: Midland, TX - Sealy, TX

Completion: 2018

Comments: Pipeline will have the capability to provide up to 540 Mbpd of take-away capacity for growing volumes of crude oil, and condensate from the Permian Basin

Map

Ongoing Projects

Owner: Enterprise Products Pipeline LP

Contractor(s): NC Contractors

Project: ECHO Phase II

Type: Project includes the extension the 30-inch ECHO Pipeline

Miles: 80

Location: Wilson County, TX – Gardendale, TX

Start: 2017

Comments: Project will increase capacity to 350,000 bpd

Map

The Pipeline Information Portal is a variety of information sources relevant to stakeholders in the oil & gas pipeline industry. Many of these resources are via PLNs sister publication Pipeline & Gas Journal (P&GJ). Includes news, developments, education, analysis, new technology, research reports, events, products / services / equipment, etc.