Bridger Logistics, Advantage Pipeline To Build Pipeline

Posted on

Bridger Logistics, LLC, a division of Bridger Group, LLC, plans to join Advantage Pipeline, LLC of Midland, TX in the development of its Pecos River Pipeline Project that will transport oil from the Delaware Basin to Gulf Coast and Midland, TX markets.
  The Pipeline will originate in the Delaware Basin near Pecos, TX and terminate in Crane, TX. At Crane, the Pipeline will connect to Magellan’s Longhorn Pipeline, as well as Centurion Pipeline’s Crane Station.  Once fully operational, the pipeline will have an initial capacity to transport 150,000 bopd and will consist of more than 75 miles of trunk line.  Lateral extensions, gathering stations, origination stations and truck offloading facilities will also be developed by Bridger Transfer Services, LLC.
  The Pecos River Pipeline Project is scheduled to be operational by Q1 2013.  Upon completion, the project will be the first to allow producers and shippers in the Delaware Basin to deliver oil directly to Crane, TX.